How Conveyor Idler Replacement Reduced Downtime in a Cement Plant
Client Leading Cement Manufacturer – South India Background The client operated a 1.8 km long overland belt conveyor for transporting crushed limestone to the raw mill. Frequent breakdowns and high noise levels from the idlers resulted in excessive downtime and increased maintenance costs. The plant management sought a reliable and
