Essar Projects India Ltd
Place: Mahan (MP)
Description: Chemical Cleaning of 2 x 600 MW Boiler units and acid cleaning of main boiler and detergent flushing of boiler front system at Mahan Thermal Power Project
Period of Execution: 2012
Place: Mahan (MP)
Description: Chemical Cleaning of 2 x 600 MW Boiler units and acid cleaning of main boiler and detergent flushing of boiler front system at Mahan Thermal Power Project
Period of Execution: 2012
Place: SEPL Site, Gudur.
Description: Chemical Cleaning by EDTA method of 2 x 150 MW CFBC Boiler. SEPL Site, Gudur
Period of Execution: 2012
Place: Chennai
Site: Mettur Thermal Power Station
Description: Chemical cleaning, Alkali flushing and Steam Blowing of Boiler at 1 x 600 MW Mettur TPS.
Period of Execution: 2011
Site: Shree Cements Ltd.
Description: Alkali flushing and chemical cleaning of Boilers, 2 x 150MW
Period of Execution: 2011
Place: Rosa Thermal Power Project
Site: Rosa
Description: Chemical cleaning and steam blowing services for Stage – II, 2 x 300 MW
Period of Execution: 2011
Place: Mumbai.
Site: Tiroda
Description: Chemical cleaning of Boiler, Turbine and associated system for 5 x 660 MW STPP
Period of Execution: 2011
Place: Raigarh
Site: Village Tamnar
Description: hemical cleaning of Boiler by EDTA Alkali Flushing of Pre – Boiler systems, pickling and passivation (Acid Cleaning) of Lube Oil piping for Unit – 3 & 4 of 4 x 135 MW CPP
Period of Execution: 2011
Place: Jaigad, Ratnagiri
Description: Chemical cleaning of 4 units of 300MW Boiler and pre – boiler
Period of Execution: 2011
Site: Gail
Description: Pre – Operational Chemical Cleaning and passivation of 1 No 110 TPH AFBC Boiler and Chemical Cleaning of Lube Oil piping in TG Package for 1 x 25 MW CTPP.
Period of Execution: 2010
Place: Balaji.
Description: Pre Operational Chemical Cleaning and Passivation of 1 No 170 TPH AFBC Boiler and Chemical Cleaning of lube oil piping in TG Package for 1 x 35 MW CPP
Period of Execution: 2010