Utility Energytech Engineers PVT Ltd
Place: Rajiv Gandhi Thermal Power Project, Hisar, Haryana.
Description: Auxiliary Boiler, Boiler Chemical Cleaning and Steam Blowing for 2 X 600 MW
Period of Execution: 2008
Place: Rajiv Gandhi Thermal Power Project, Hisar, Haryana.
Description: Auxiliary Boiler, Boiler Chemical Cleaning and Steam Blowing for 2 X 600 MW
Period of Execution: 2008
Place: Ghaziabad.
Sites: Sidhi (MP) & Dalla (UP).
Description: Pre-operational Chemical Cleaning of 2 X 85 TPH AFBC Boiler & Lube oil piping in TG Package for 35 MW CPP & 1 x 125 TPH Boiler and Lube Oil Piping in TG Package for 27 MW CPP
Period of Execution: 2008
Place: Nagpur.
Site: Kutch Lignite TPS.
Description: Pre commissioning Chemical cleaning of 1 x 75 MW Power Plant Boiler, KLTPS.
Period of Execution: 2008
Place: Kolkata.
Site: Haldia.
Description: Pre commissioning Alkali Flushing of pre boiler system at Haldia.
Period of Execution: 2008
Place: Kolkata.
Description: Pre commissioning Chemical cleaning of 2nd Unit (1 X 300 MW) of Sagardighi Boiler.
Period of Execution: 2008
Place: Gurgaon.
Site: Korba.
Description: Pre commissioning Chemical cleaning of Boiler & Accessories & Steam Blowing for 2 x 300 MW Thermal Power Plant,Pathadi, Korba.
Period of Execution: 2008
Place: Tuticorin
Description: Cleaning of Inter Heat Exchanger Tubes
Period of Execution: 2008
Place: Tuticorin
Description: Preheat exchanger tube cleaning
Period of Execution: 2008
Place: Mumbai.
Site: HPCL
Description: Chemical cleaning of vessels & pipes
Period of Execution: 2008
Place: Kolkataa.
Site: HPCL, Vizag
Description: Chemical Cleaning of Vessels
Period of Execution: 2008